CHALLENGE
COMPANY
Industry dedicated to the printing of labels and wrappers for tea, coffee, and mate infusions. Argentina.
DATE
2017 to present
SOLUTION
Development and implementation of strategies to replace solvent-based printing inks with water-based inks with better performance, using lighter and recyclable packaging. This effort was carried out in collaboration with the ink supplier.
ACHIEVEMENTS
- Replacement of plastic and metal containers with lighter "bag-in-box" packaging.
- 70% reduction in the volume of special waste generation.
- Significant decrease in negative environmental impact.
- Optimization in the handling of raw materials and reduced risks for workers.
- Cost reduction associated with both ink usage optimization and waste management.
- Increased available space for related production processes.
CHALLENGE
COMPANY
The metal mechanics industry is dedicated to the manufacturing of packaging machines. Argentina.
DATE
2019 to Present
SOLUTION
Redesign and replacement of technologies through the acquisition of an ultrasonic cleaning machine and the incorporation of a biodegradable surfactant to replace solvent-based cleaning.
ACHIEVEMENTS
- Elimination of risks associated with the use of solvents for people, facilities, and the environment.
- Improvement in the surface quality of parts, enhancing the effectiveness of the subsequent process.
CHALLENGE
COMPANY
Construction project of an international industrial plant in the Industrial Park of the City of Mar del Plata, Argentina.
DATE
2022 to Present
SOLUTION
Design of a Comprehensive Waste Management Plan based on the principles of Circular Economy and aligned with the National Circular Economy Plan for Waste from the Ministry of Environment and Sustainable Development.
ACHIEVEMENTS
- Reuse of soil removed from the site during soil works for the restoration, enhancement, and reforestation of a nearby quarry.
- On-site separation and classification of construction waste, in partnership with a local recycling cooperative registered and authorized by the municipality.
- Minimization of the volume of waste sent to the local landfill.
- Proper management of special waste in compliance with applicable legal requirements.
- Improvement in the order and cleanliness of the construction site, making the workspace safer and healthier.
CHALLENGE
COMPANY
Gas pipeline expansion project in the cities of Tandil, Balcarce, and Mar del Plata, Argentina.
DATE
2022 to Present
SOLUTION
- Control and monitoring of the project's environmental aspects.
- Assurance of compliance with the Environmental Monitoring Plan.
- Delivery of specific training sessions.
- Analysis and management of environmental incidents.
- Management of special waste generated on-site.
ACHIEVEMENTS
- Compliance with legal and regulatory requirements.
- Comprehensive waste management.
- Minimization and proper treatment of the waste generated.
CHALLENGE
COMPANY
Potato processing plant. Argentina.
DATE
2022 to Present
SOLUTION
Various solutions were implemented based on process optimization and the adoption of best production practices:
- Monitoring and control of water consumption through KPIs (Key Performance Indicators).
- Reuse of washing water.
- Improvements in machinery and processes.
- Implementation of a Maintenance Program.
ACHIEVEMENTS
Currently in the implementation phase. The following improvements are estimated:
- 55% reduction in total water consumption.
- Decrease in effluent generation by 23 m³/h.
- Energy savings of 2500 kWh/month.
CHALLENGE
COMPANY
Hotel establishment. Argentina.
DATE
2022
SOLUTION
A Waste Management System was designed and implemented, which includes:
- Classification, characterization, and separation of waste.
- Design of a storage system and selection of collection areas.
- Design of a composting system for organic waste.
ACHIEVEMENTS
- Compliance with legal and regulatory requirements.
- Comprehensive waste management.
- Minimization and proper treatment of waste.
CHALLENGE
COMPANY
Service industry dedicated to surface treatment of mechanical parts. Argentina.
DATE
2021-2022
SOLUTION
- Design and implementation of a Quality Management System tailored to the company's needs.
- Staff training.
- Definition of KPIs (Key Performance Indicators).
- Conducting internal audits.
ACHIEVEMENTS
Obtained ISO 9001:2015 certification.
CHALLENGE
COMPANY
Private neighborhood located near the city of Pinamar, Argentina.
DATE
2022 to Present
SOLUTION
- Design and implementation of a Quality Management System tailored to the organization's needs.
- Staff training.
- Definition of KPIs (Key Performance Indicators).
- Conducting internal audits.
ACHIEVEMENTS
Obtained ISO 9001:2015 certification.
CHALLENGE
COMPANY
Shipyard. Argentina.
DATE
2022 to Present
SOLUTION
- Design and implementation of a Quality Management System tailored to the company's specific needs.
- Staff training.
- Definition of KPIs (Key Performance Indicators).
- Conducting Internal Audits.
ACHIEVEMENTS
Obtained ISO 9001:2015 certification.
CHALLENGE
COMPANY
Metalworking industry dedicated to the manufacturing of lifting hardware. Argentina.
DATE
2013 to Present
SOLUTION
- On-site visits.
- Meetings and interviews with those responsible for the processes to be audited.
- Closing meeting.
- Preparation and presentation of the closing report.
ACHIEVEMENTS
Company certification in ISO 9001:2015.
CHALLENGE
COMPANY
Construction of an industrial plant to be installed in the Industrial Park of the City of Mar del Plata, Argentina.
DATE
2022 to Present
SOLUTION
- Development of a Comprehensive Hygiene, Safety, and Environmental Management (HSE) Plan.
- Preparation of the Contingency Plan.
- Definition, measurement, and monitoring of specific KPIs for the project.
- Incident analysis.
- Contractor management.
- Staff training.
ACHIEVEMENTS
- Efficient management of Occupational Health, Safety and Environment on-site.
- Compliance with legal and regulatory requirements.
- Efficient management of waste and pollutants.
- Compliance with the Environmental Monitoring Plan.
CHALLENGE
COMPANY
Shipyard. Argentina.
DATE
2017 to Present
SOLUTION
- Development of a comprehensive Occupational Health, Safety, and Environmental Management Plan.
- Preparation of the Contingency Plan.
- Definition, measurement, and monitoring of KPIs.
- Incident analysis.
- Staff training.
- Design, implementation, monitoring, and control of the Quality Management System (QMS).
ACHIEVEMENTS
- Efficient management of Occupational Health, Safety, and Environment in the company.
- Compliance with legal and regulatory requirements.
- Efficient management of waste and pollutants.
- Certification of the Quality Management System under ISO 9001:2015.
CHALLENGE
COMPANY
Agricultural company specialized in potato production. Argentina.
DATE
2017 - 2023
SOLUTION
- Development of the Occupational Health and Safety Management Plan for the plant and rural areas.
- Drafting of the Contingency Plan.
- Definition, measurement, and monitoring of KPIs.
- Incident analysis.
- Delivery of training sessions.
- Development of the Comprehensive Waste Management Plan.
ACHIEVEMENTS
- Implementation of the Occupational Health and Safety Management System.
- Compliance with legal requirements.
- Efficient waste management.
CHALLENGE
COMPANY
Mar del Plata – Batán Industrial Park. Argentina.
DATE
2020
SOLUTION
- Meetings with Industrial Park authorities and the Occupational Health and Safety Commission.
- Interdisciplinary work with all stakeholders, including companies, authorities, firefighters, security, civil defense, and others.
ACHIEVEMENTS
- Identification of present risks according to the industries located in the area.
- Definition of action plans for each type of risk analyzed, including the Park's Evacuation Plan.
- Drafting of the document – Contingency Plan.
- Establishment of the Crisis Committee and Emergency Brigade.
- In-person and virtual training for all personnel.
- Crisis table simulation.
CHALLENGE
COMPANY
Logistics park is located on Route 226. Argentina.
DATE
2019
SOLUTION
- Meetings with Park authorities.
- Definition of guidelines.
ACHIEVEMENTS
- Identification of present risks according to the industries located in the area.
- Definition of action plans for each type of risk analyzed, including the Park's Evacuation Plan.
- Drafting of the document – Contingency Plan.
- Establishment of the Crisis Committee and Emergency Brigade.
- In-person and virtual training for all personnel.
- Crisis table simulation.
- Fire network use simulation.
CHALLENGE
EVENT
Massive outdoor show at Las Toscas. City of Mar del Plata. Approximate attendance of 100,000 people. Argentina.
DATE
2023
SOLUTION
- Meetings with municipal and provincial authorities to define guidelines.
- Interdisciplinary work with all stakeholders, including the production company, authorities, firefighters, public security, private security, civil defense, medical care, rescue teams, and others.
ACHIEVEMENTS
- Identification of risks based on the specific characteristics of the event and the attending audience.
- Definition of action plans for each type of risk analyzed, including the Evacuation Plan.
- Determination of necessary street closures.
- Determination of the required number of firefighters, public security, private security, traffic personnel, civil defense, medical care, and rescue teams.
- Drafting of the document – Contingency Plan.
- Establishment of the Crisis Committee and its responsibilities.
- In-person and virtual training for all personnel involved in the event.
CHALLENGE
EVENT
Massive shows on the beach. Southern beach resort, city of Mar del Plata. Average attendance per show: approximately 8,000 people. Argentina.
DATE
2023
SOLUTION
- Meetings with municipal and provincial authorities to define guidelines.
- Interdisciplinary work with all stakeholders, including the production company, authorities, firefighters, public security, private security, civil defense, medical care, rescue teams, and others.
ACHIEVEMENTS
- Identification of risks based on the specific characteristics of each event and the attending audience.
- Definition of action plans for each type of risk analyzed, including the Evacuation Plan.
- Determination of necessary street closures.
- Determination of the required number of firefighters, public security, private security, traffic personnel, civil defense, medical care, and rescue teams.
- Drafting of the document – Contingency Plan.
- Establishment of the Crisis Committee and its responsibilities.
CHALLENGE
EVENT
Musical shows at Islas Malvinas Sports Stadium, city of Mar del Plata. Average attendance per show: approximately 6,000 people. Argentina.
DATE
2023
SOLUTION
- Meetings with municipal and provincial authorities to define guidelines.
- Interdisciplinary work with all stakeholders, including the production company, authorities, firefighters, public security, private security, civil defense, medical care, rescue teams, and others.
ACHIEVEMENTS
- Identification of risks based on the specific characteristics of each event and the attending audience.
- Definition of action plans for each type of risk analyzed, including the Evacuation Plan.
- Determination of the required number of firefighters, public security, private security, traffic personnel, civil defense, medical care, and rescue teams.
- Drafting of the document – Contingency Plan.
- Establishment of the Crisis Committee and its responsibilities.